-
Battipalo idraulico
-
escavatore montato battipalo
-
Martello elettrico vibratore
-
Piledriver laterale della presa
-
Quattro piloti eccentrici
-
Guida di 360 gradi
-
Mini Excavator Pile Driver
-
Attrezzatura concreta di azionamento di mucchio
-
Pile driver lungo boom
-
Asta meccanica
-
Parti del piledriver
-
Perforatrice del foro
-
Taglierina idraulica della barriera
-
Trencher idraulico
-
Conduttore di pile fotovoltaiche
-
Palancola che guida macchina
-
Martello idraulico
-
Interruttore idraulico del mucchio
Versatile & Agile: SV-200 Side Grip Pile Driver – 459 KN Force, Dual-Clamp System, Fits 20–25t Excavators
The SV-200 Side Grip Pile Driver is a specialized hydraulic vibratory hammer attachment designed to transform standard 20–25 ton excavators into high-performance piling rigs. Engineered for low clearance and narrow job sites such as factory extensions, bridge underpasses, and urban infrastructure projects, the SV-200 combines 459 kN centrifugal force with a patented dual-clamp system to handle clamping, positioning, driving, and extraction in one continuous operation—no crane or helper equipment required.
| Parameter | Value |
|---|---|
| Model | SV-200 Side Grip Pile Driver |
| Centrifugal Force | 459 kN |
| Eccentric Moment | 4.6 kg·m |
| Frequency Range | 2,300 – 3,000 rpm |
| Side Clamp Force | 335 kN |
| Bottom Clamp Force | 385 kN |
| System Pressure | 32 MPa |
| Required Flow | 170 – 230 L/min |
| Rotation Angle | 360° continuous |
| Tilt Angle | ±30° bidirectional |
| Dimensions (L×W×H) | 1,220 × 1,260 × 2,150 mm |
| Weight (with connector & clamp) | 2,280 kg |
| Compatible Excavators | 20 – 25 tons |
-
Side Clamp (335 kN): Securely grips piles during positioning and extraction.
-
Bottom Clamp (385 kN): Provides stable clamping during driving, preventing slippage.
-
Together they enable seamless transition from clamping to driving to extraction—all from the excavator cab.
-
360° continuous rotation allows operators to align piles from any angle without repositioning the excavator.
-
±30° bidirectional side tilt enables precise vertical alignment even on uneven terrain or under overhead obstructions.
-
Replaceable standard clamp seat interface accepts:
-
Steel sheet piles (Larssen, straight web)
-
H-beams (HP sections)
-
Circular pipe piles
-
-
Quick-change design minimizes downtime between pile type changes.
-
Operates at 32 MPa with flow demand matched to 20–25t excavator hydraulics.
-
Frequency range 2,300–3,000 rpm adapts to varying soil conditions—higher frequencies for granular soils, lower for cohesive ground.
-
Reinforced box-style housing resists torsional stress.
-
Hardened steel clamp jaws ensure long service life even in abrasive soils.
-
Designed for easy maintenance with accessible grease points and wear-part replacements.
| Advantage | Benefit for Customer |
|---|---|
| No Crane Needed | Eliminates rental costs for auxiliary lifting equipment. |
| One-Man Operation | Excavator operator handles entire piling cycle—reduces labor costs. |
| Compact Footprint | Works where conventional rigs cannot enter (e.g., inside existing factories, between building columns). |
| Fuel Efficient | Powered directly by excavator hydraulics; no separate power pack means lower fuel consumption. |
| Easy Installation | Mounts to standard excavator arm with minimal modification; can be swapped with bucket in under 2 hours. |
| Low Maintenance | Interchangeable wear parts and centralized greasing points reduce downtime. |
A: The SV-200 is designed for 20–25 ton excavators from any major brand (Cat, Komatsu, Hitachi, Kobelco, Hyundai, Doosan, etc.). We provide custom mounting brackets to match your machine's arm pin dimensions.
A: Yes. The SV-200 performs full-cycle piling—clamping, positioning, driving, and extracting—using the same attachment. The dual-clamp system provides sufficient grip for extraction forces.
A: It handles:
-
Steel sheet piles: Up to 12 m length (depending on soil)
-
H-beams: Up to 400 mm section height
-
Pipe piles: Up to 600 mm diameter
Contact us with your specific pile dimensions for a compatibility check.
A: No. The SV-200 is directly driven by your excavator's hydraulic system. We recommend verifying that your machine can supply 170–230 L/min at 32 MPa. A hydraulic flow/pressure test can be arranged.
A: Installation takes approximately 2–3 hours:
-
Remove bucket and link.
-
Mount the SV-200 bracket to excavator arm.
-
Connect hydraulic hoses to excavator's auxiliary circuit (breaker/hammer lines).
-
Test rotation and clamp functions.
Detailed installation manual and on-site support available.
A: Standard warranty is 12 months from date of shipment, covering manufacturing defects. Extended warranty options are available upon request.
A: We have authorized service partners in India, Indonesia, Vietnam, Thailand, and Russia. For other markets, we offer remote troubleshooting and rapid spare parts dispatch.
A: The SV-200 is designed for above-water and splash-zone applications. For fully submerged piling, please inquire about our dedicated underwater hammer models.
In markets like India's rapid urbanization, Southeast Asia's infrastructure boom, and Russia's industrial expansion, contractors face common challenges: confined sites, tight budgets, and demanding schedules. The SV-200 Side Grip Pile Driver delivers a cost-effective, space-saving, and operator-friendly solution that keeps your project moving—no matter how tight the space.
Contact us today for a quotation or to arrange a demonstration with a compatible excavator in your region.a

